Completed
Caustic Soda Plant
Engineering, fabrication and erection supervision for plant structures and pipe racks. A chemical plant sets its own corrosion protection specification, and the steel is detailed to it rather than to a general building standard.
- Location
- Mesaieed, Qatar
- Status
- Completed
- Consultant
- QDC Qatar Design Consortium

01 · Scope
What the contract covered
Engineering, fabrication and erection supervision for plant structures and pipe racks. A chemical plant sets its own corrosion protection specification, and the steel is detailed to it rather than to a general building standard.
02 · Details
Where it was built, and with whom
- Location: Mesaieed, Qatar
- Status: Completed
- Client: Alfowryia Contracting / Qatar Project Supplies
- End user: QIMC / KLJ
- Consultant: QDC Qatar Design Consortium
03 · Services
The services this project used
- Structural Steel, Pipe Racks & Truss Systems
Record
Services delivered
Four service lines, delivered under one contract or separately.
Structural Steel, Pipe Racks & Truss Systems
Pipe Racks & Plant Structures
Pipe racks and plant structures for industrial facilities in Qatar, detailed to the plant's own corrosion protection specification.
Delivered across Qatar
Counted from the projects published below. Where a client is bound by confidentiality the project is described by scope and scale instead of being named — the building is still real and the figures are still theirs.
- Private Residence Flat-Roof StructureFabrication and erection of the structural steel for a flat-roof building at a private residence, on a clear span of 18 metres. A flat roof over a clear span carries its own weight the hard way — the depth of the members, the deflection limit and the drainage falls have to be settled together before anything is cut.
- Al Hattab WarehouseFabrication and erection of the structural steel for a 1,200 square metre warehouse at Birkat Al Awamer. A single-span shed of this size is priced on its tonnage and erected in days; the value Masas adds is getting the frame plumb and the purlin lines true, so the cladding contractor is not correcting steel.
- Paris Hypermarket WarehouseFabrication and erection of the structural steel for a 4,000 square metre warehouse in the Old Industrial Area. A retail distribution store lives or dies on its clear floor: the frame is set out to keep the bays open for racking and the door heights clear for vehicles.
Send us a scope and we will price it
Drawings, a bill of quantities or a description of the structure — whichever you have. WhatsApp reaches us fastest.