Pre-Engineered Warehouses & Stores
Pre-engineered steel warehouses and stores across Qatar, designed, fabricated and erected by Masas, with accommodation or showrooms alongside.
Read the full pageServices
Design, fabrication and erection of pre-engineered steel buildings — warehouses, workshops and factories.


Services
Design, fabrication and erection of pre-engineered steel buildings (PEB) — warehouses, workshops, factories, stores and labour accommodation. A pre-engineered building suits a regular, repeating envelope, where the frame can be optimised to a standard bay and fabricated to a repeated detail. The test is whether the building repeats, not how big it is; where it does not, conventional structural steel is the better answer, and Masas delivers both.
The record on this site includes warehouses with labour accommodation alongside them, a bottling plant, a food storage building with a temperature-controlled interior, a cold store, a food processing building detailed for hygienic production, a plastics factory with roof ventilation for a process that runs hot, workshops sized for truck and mobile crane maintenance, canteen buildings on an operating school campus, and manufacturer-branded vehicle service centres. Where the envelope is the product — a cold store, a wash-down bottling hall — the frame and the cladding are detailed together.
Every building follows the same five stages. The scope is confirmed in writing before quoting. Shop drawings, method statement, inspection and test plan and risk assessment go to the consultant for approval against QCS 2014. Cutting, fitting, welding and surface protection happen in the workshop, inspected against the approved plan. Transport and erection are sequenced around the main contractor's programme. Snagging, as-built documentation and the certificates the consultant needs then close the package.
Construction, installation and erection of pre-engineered buildings and warehouses are named in the scope of Masas's ISO 9001, ISO 14001 and ISO 45001 certificates.
Design, fabrication and erection of pre-engineered steel buildings — warehouses, workshops and factories.
In depth
The lines within this service that have a page of their own, each with the projects that demonstrate it.
Pre-engineered steel warehouses and stores across Qatar, designed, fabricated and erected by Masas, with accommodation or showrooms alongside.
Read the full pagePre-engineered factory buildings in Qatar for bottling, plastics, food processing and manufacturing, with the envelope detailed to the process inside.
Read the full pageSteel workshops, showrooms and vehicle service centres in Qatar, from heavy truck and crane workshops to manufacturer-branded service centres.
Read the full pageSteel school buildings, sports halls and campus buildings in Qatar, programmed around term dates, including a 64-metre clear-span sports hall.
Read the full pageRecord
Contract values are not published. Scale is stated in area and clear span.
Design, fabrication, supply and installation of the steel building for two warehouses and two labour accommodation buildings. Prequalification was approved by the consultant against QCS 2014, subject to shop drawings, method statement, ITP and risk assessment.
View projectEngineering, fabrication and erection of the structural steel for a school building, sequenced around an occupied campus. The school is Beverly Hills International School (BHIS).
View projectEngineering, fabrication and erection of an extension to a working extrusion plant, tied into the existing structure while production continued.
View projectDesign, fabrication and erection of a 64-metre clear-span hall. A span of this order removes every internal column from the playing area, which is what makes the hall usable for full-size courts.
Fabrication and erection of a 60-metre clear-span hangar. The span is set by the aircraft, not by the structure — the door opening governs the primary frame.
Design, fabrication and erection of the plant building. A bottling hall is a wash-down environment, which governs the cladding and the detailing at every junction.
View projectEngineering, fabrication and erection of a food storage building, with the envelope detailed for a temperature-controlled interior.
View projectDesign, fabrication and erection of a combined showroom and workshop — a glazed public frontage on one side of the same frame as a working service bay.
View projectInsights
Design, fabrication and erection of pre-engineered steel buildings — warehouses, workshops and factories.
Warehouse quotations come back far apart because each contractor fills the gaps in the brief differently. Settle these decisions first and the prices become comparable.
Read moreThe choice is decided by the geometry and the loading, not by which system a supplier happens to sell. Here is the test that separates them.
Read moreA column-free interior is the most expensive thing you can ask a steel frame for, and sometimes the only thing that makes the building work. How to tell which case you are in.
Read moreFour service lines, delivered under one contract or separately. Each is engineered, fabricated and erected by Masas in Qatar.
Send drawings or a scope and we will come back with a quotation.
