- Is a pre-engineered warehouse cheaper than conventional steel?
- Usually, when the building repeats, because identical frames are quicker to fabricate and erect. The saving shrinks when the frame has to carry heavy point loads such as a crane, or when the plan is irregular. Masas builds both systems and can say from the drawings which one suits the building.
- Can Masas build a warehouse with labour accommodation on the same site?
- Yes. Masas built a warehouse and labour accommodation for Kobra Cleaning in Al Wakrah, and is building two warehouses and two accommodation buildings for Dar Al-Anwar Trading Co. Each building type has its own fire and life-safety requirements, and each is designed to meet them.
- Can a pre-engineered store include a mezzanine floor?
- Yes. The Masas record includes a ground-plus-mezzanine store for a state office, where the mezzanine has its own framing and access steel. A mezzanine should be part of the design from the start, because adding one after the frame is fabricated usually means reworking it.
- Does Masas only erect warehouses, or design them too?
- Both. Masas prices a warehouse as a full package of design, fabrication and erection, or as any part of it: design only, supply only, or erection of steel that another company fabricated.
- Who approves the steel drawings for a warehouse?
- The consultant appointed on your project. Before fabrication starts, Masas submits shop drawings, a method statement, an inspection and test plan and a risk assessment for approval against QCS 2014, the Qatar Construction Specifications.