Ongoing
Store for Educational & Stationery Materials
Design, fabrication, supply and installation of the steel building for two warehouses and two labour accommodation buildings. Prequalification was approved by the consultant against QCS 2014, subject to shop drawings, method statement, ITP and risk assessment.
- Location
- Qatar
- Status
- Ongoing
- Consultant
- Hany Tawfik Consulting Office

01 · Scope
What the contract covered
Design, fabrication, supply and installation of the steel building for two warehouses and two labour accommodation buildings. Prequalification was approved by the consultant against QCS 2014, subject to shop drawings, method statement, ITP and risk assessment.

02 · Details
Where it was built, and with whom
- Location: Qatar
- Status: Ongoing
- Client: Anwar One Construction Company
- End user: Dar Al-Anwar Trading Co.
- Consultant: Hany Tawfik Consulting Office
03 · Services
The services this project used
- Structural Steel, Pipe Racks & Truss Systems
- Pre-Engineered Buildings
- Roofing & Cladding Systems
From site
Photographs taken during fabrication and erection.

Record
Services delivered
Four service lines, delivered under one contract or separately.
Structural Steel, Pipe Racks & Truss Systems
Engineering, fabrication and erection of structural steel frames, pipe racks and truss systems for industrial buildings.
Pre-Engineered Buildings
Pre-Engineered Warehouses & Stores
Pre-engineered steel warehouses and stores across Qatar, designed, fabricated and erected by Masas, with accommodation or showrooms alongside.
Roofing & Cladding Systems
Supply and installation of roofing and wall cladding systems for industrial and commercial buildings across Qatar.
Delivered across Qatar
Counted from the projects published below. Where a client is bound by confidentiality the project is described by scope and scale instead of being named — the building is still real and the figures are still theirs.
- Aluminium Extrusion Factory ExtensionEngineering, fabrication and erection of an extension to a working extrusion plant, tied into the existing structure while production continued.
- Multi-Purpose Sports HallDesign, fabrication and erection of a 64-metre clear-span hall. A span of this order removes every internal column from the playing area, which is what makes the hall usable for full-size courts.
- An aircraft hangar on a 60-metre clear spanFabrication and erection of a 60-metre clear-span hangar. The span is set by the aircraft, not by the structure — the door opening governs the primary frame.
Send us a scope and we will price it
Drawings, a bill of quantities or a description of the structure — whichever you have. WhatsApp reaches us fastest.
