Structural Steel, Pipe Racks & Truss Systems

Architectural steelwork in Qatar

Architectural steelwork is structural steel that stays visible once the building is finished, such as an entrance structure or an exposed frame. It is for owners and architects who want the steel to be part of the design.

Drawings or a written scope is enough to price it.

A crane easing a canopy beam into place against the hotel facade while a worker guides it

Architectural Steelwork & Entrance Structures

When steel is on show, the finish has to be specified, not assumed.

Masas engineered, fabricated and erected a new entrance at InterContinental Doha, including its building envelope. For Qetaifan Projects in Lusail, it designed, fabricated and supervised erection of eight retail buildings, with steel exposed to a public promenade and the coast.

Looking up as a lattice canopy beam is flown in over the curved entrance soffit

Architectural Steelwork & Entrance Structures

What is architectural steelwork?

In most buildings the steel frame is hidden behind cladding, ceilings or fireproofing, so nobody sees the welds or the joints. Architectural steelwork is the opposite. The columns, beams and connections are left exposed on purpose, and they carry the building while also forming part of how it looks.

Because people see it up close, the standard changes. A weld that is structurally sound may still look rough, and a bolt pattern that works may look untidy. The drawings and the specification have to say how every visible joint should look, and the workshop has to make it that way.

Exposed steel also has nothing covering it from the weather. Outdoors in Qatar it faces sun, dust and, near the coast, salt in the air, which speeds up corrosion. The protective coating is therefore both the appearance and the defence, and it is chosen with both in mind.

  • Hotel and building entrance structures

  • Exposed frames on retail and public spaces

  • Steel that meets glazing or cladding in view

  • Coastal and waterfront structures

Before you decide

Decisions to settle before fabrication

Exposed steel is hard to correct once it is made. These three decisions belong in the drawings, not on site.

How the joints should look

Decide which welds are ground smooth, whether connections are welded or bolted, and where bolts may show. A welded joint made to be seen takes more workshop time than a hidden one, so agreeing this early keeps the price honest and avoids rework.

What the steel is exposed to

Indoor steel, outdoor steel and steel near the sea need different protection. Salt air, direct sun and people touching the steel all affect the choice between a paint system and hot-dip galvanising. Tell the designer where each part will stand.

Where the steel meets glass and cladding

An entrance structure is rarely steel alone. Glazing, roofing or panels fix to it, and those joints are visible. When one subcontractor carries the frame and the envelope, as at InterContinental Doha, one team is responsible for how that line fits and looks.

Plain terms

Terms you will see in the specification

These words decide how the steel will look when it is finished, and how long it will keep looking that way.

Painted canopy beams waiting on the trailer beside the arched entrance, crane rigged behind

How an architectural steel project runs

Exposed steel follows the same approved stages as any steel package, with more attention on appearance at each one.

  1. 01

    Finish agreed in writing

    Masas confirms the scope in writing before quoting, including which steel is exposed, how its joints should look and which protective coating the specification requires.

  2. 02

    Drawings show visible joints

    Shop drawings show each connection as it will be built. They go to the consultant with a method statement, an inspection and test plan and a risk assessment, for approval against QCS 2014.

  3. 03

    Welding and coating

    Steel is cut, welded to AWS standards, blast-cleaned and coated in the Masas workshop, and inspected against the approved plan, so the finish is made under cover rather than on site.

  4. 04

    Erection and handover

    Erection is sequenced to the main contractor’s programme. Snagging, as-built documentation and the certificates the consultant needs close the package.

For a quotation

What to send for an accurate quotation

  1. Architectural and structural drawings

    Both sets, because the architectural drawings show what will be seen and the structural drawings show what carries the load.

  2. The finish and coating specification

    Any requirement for weld finish, connection type, paint system, colour or galvanising. If it is not decided yet, say so.

  3. Where the structure stands

    Indoors or outdoors, how close to the sea, and whether the public can touch it. This decides the protection the steel needs.

  4. What else attaches to the steel

    Glazing, roofing, cladding, lighting or signage, and whether you want Masas to include the envelope in the same package.

The trussed roof close up, top and bottom chords bolted over scaffolded blockwork walls

Record

Where we have delivered this

Contract values are not published. Scale is stated in area and clear span.

Hotel Entrance Structure

Engineering, fabrication and erection of a new hotel entrance, including building envelope solutions. Architectural steel at a hotel entrance is seen at arm's length by every guest, so the weld and finish standard is an architectural one, not a structural one.

View project

Retail Plaza

Design, fabrication and erection supervision for eight buildings in a single retail plaza — a repeated structural bay with architectural steel exposed to a public promenade and to coastal conditions.

View project

The full project record

Every published Masas project, named or anonymised, with its scope and scale.

See all projects

Common questions

Does Masas fabricate exposed architectural steel?
Yes. Masas engineered, fabricated and erected a new entrance structure at InterContinental Doha, where every guest sees the steel at arm’s length, so the weld and finish standard was an architectural one. Masas also designed and fabricated eight retail buildings for Qetaifan Projects in Lusail, with steel exposed to a public promenade.
How does Masas protect exposed steel near the coast?
Masas delivers surface protection as part of the steel package, to the project specification: blast-cleaning and a paint system, and hot-dip galvanising where the design calls for it. Salt air speeds up corrosion, so the specification for a coastal structure, such as the Qetaifan Projects retail plaza in Lusail, needs to reflect that exposure.
Can Masas supply the entrance steel and its envelope together?
Yes. At InterContinental Doha, Masas carried the entrance structure together with its building envelope solutions. Roofing and cladding systems are named in Masas’s ISO-certified scope alongside structural steel, so the frame and the envelope can come under one subcontract and one team answers for the joint between them.
Is architectural steel within Masas’s ISO certification?
Yes. The ISO 9001, ISO 14001 and ISO 45001 certificates held by Masas name structural steel buildings and miscellaneous steel work within their scope, covering construction, installation and erection rather than fabrication alone.
Will Masas work from an architect’s design?
Yes. Masas prices steel as a full package of design, fabrication and erection, or as any part of it. On the Qetaifan Projects retail plaza Masas carried design, fabrication and erection supervision. In every case the shop drawings go to the project consultant for approval against QCS 2014 before fabrication starts.