Structural Steel, Pipe Racks & Truss Systems

Factory extensions in Qatar

A factory extension adds floor area to an existing production building by joining a new steel structure to the old one. Masas designs, fabricates and erects extensions as part of its structural steel service, including beside plants that stay in production.

Drawings or a written scope is enough to price it.

The extension frame with sprinkler pipework above packs of aluminium profiles stacked in the yard

Steel Factory Extensions

The hardest part of an extension is where it meets the existing building.

Masas is extending Qatar Aluminium Extrusion Company’s plant, tied into the existing structure while production continues. It also completed an extension tied into Barq Group’s working battery factory, where its scope was engineering, fabrication and erection supervision.

The new portal frame standing on bare ground against the red-clad production hall it extends

Steel Factory Extensions

What does extending a factory involve?

An extension is a new steel structure built against, or joined to, a production building that already exists. It may continue the existing hall in the same shape, or add a hall of a different width or height beside it. Either way, the new steel has to meet the old building at its columns, its roof and its walls.

The design starts from what the extension is for: another production line, more storage or larger machines. Then comes the question of how it connects. Some extensions stand on their own columns beside the old building, with a joint between them that lets each move. Others rest on the existing columns, which works only if those columns can carry the extra load.

What sets a factory extension apart from a new building is that the factory usually has to keep running. Lifting, deliveries and welding happen close to people, stock and machines, so the work is planned around the plant’s shifts, access routes and safety rules, not only around the steel.

  • New production halls beside an existing line

  • Storage or dispatch areas added to a working factory

  • Taller or wider halls for new machinery

  • The extension’s roof and wall cladding in the same package

How a factory extension project runs

The stages match a new building, with extra care wherever the work meets the existing plant.

  1. 01

    Tie-ins agreed in writing

    Masas reviews the drawings or survey information of the existing building, then confirms in writing the extension’s scope, its tie-in points and what the price includes, before quoting.

  2. 02

    Plans approved

    Shop drawings, the method statement, the inspection and test plan and the risk assessment go to your consultant for approval against QCS 2014, before any work starts beside the operating plant.

  3. 03

    Fabricated ready to fit

    Steel is cut, welded to AWS standards and protected in the Al Wukair workshop, and inspected against the approved plan. Work done in the workshop is work not done on site next to production.

  4. 04

    Erected beside production

    Erection follows the sequence agreed with the main contractor and the plant. Snagging, as-built drawings showing the extension and its tie-ins as built, and the consultant’s certificates close the package.

Before you decide

What shapes an extension’s design and price

Four questions decide most of how an extension is designed, priced and built. Answering them early avoids surprises once the existing building is opened up.

What the existing building can carry

If the extension is to rest on existing columns or continue the old roof, those members must take the extra load. Original drawings or a survey show whether they can. Where they cannot, the extension gets its own columns alongside, which adds steel but leaves the old frame untouched.

Same shape, or a new one

Repeating the existing frame spacing and roof slope can suit a pre-engineered frame, because the parts repeat. A wider span, a taller hall, an overhead crane or heavy equipment usually suits conventional structural steel. Masas builds both, so the choice follows the extension.

Where the new roof meets the old

Water gathers where two roofs meet, especially when the new roof is higher or drains towards the old one. The gutter, the flashing (the folded metal covering the joint) and any movement joint decide whether that line stays dry. With frame and cladding under one subcontract, one party answers for it.

Keeping production running

Which areas must stay open, when deliveries arrive, where cranes can stand and whether a wall of the existing hall has to be opened all shape the erection sequence. Opening a wall usually needs a temporary screen to keep dust and weather out of the working hall.

Plain terms

Terms you will meet in an extension project

These words come up whenever a new structure is joined to an old one.

Tie-in

A point where new steel connects to the existing building, such as a column, a roof beam or a foundation. Each tie-in is checked against what the existing structure can safely carry.

Movement joint

A deliberate gap between the old and new structures, covered so that it stays weathertight. It lets each building expand, contract and settle on its own without pulling on the other.

Survey of the existing structure

Measuring and inspecting the building as it actually stands: column positions, steel sizes, heights and condition. Old drawings often differ from what was built, so the design relies on what is really there.

Permit to work

Written permission from the factory before work starts in a given area, for example welding near stock or lifting over a roadway. Plants use permits to stop contractors’ work clashing with their own operations.

For a quotation

What to send for an accurate quotation

  1. Drawings of the existing building

    Original structural drawings, the name of the original steel supplier if known, or photographs and measurements. The more that is known about the existing frame, the less has to be assumed.

  2. The extension’s size and use

    Plan dimensions, the clear height you need, and what will happen inside: a production line, storage, machinery, an overhead crane or a mezzanine.

  3. How the plant operates

    Working hours, the areas that must stay in use, delivery routes, and any safety rules or permits that contractors on site must follow.

  4. The scope to be priced

    Whether you need design, fabrication, erection or all three, and whether the roof and wall cladding and the junction with the old roof are included.

Record

Where we have delivered this

Contract values are not published. Scale is stated in area and clear span.

Aluminium Extrusion Factory Extension

Engineering, fabrication and erection of an extension to a working extrusion plant, tied into the existing structure while production continued.

View project

Battery Factory Extension

Engineering, fabrication and erection supervision for a factory extension tied into the existing production building.

View project

The full project record

Every published Masas project, named or anonymised, with its scope and scale.

See all projects

Common questions

Can Masas extend a factory while it keeps producing?
Yes. Masas is engineering, fabricating and erecting an extension to Qatar Aluminium Extrusion Company’s plant, tied into the existing structure while production continues, and completed an extension tied into Barq Group’s working battery factory. The method statement and risk assessment for working beside the plant go to the consultant for approval before work starts.
Does Masas need drawings of the existing building?
They help a great deal. Original drawings, details from the original steel supplier or a site survey show what the existing structure can carry and where new steel can connect to it. Without them, more has to be checked on site before design. Send Masas whatever is available with the scope of work.
Should an extension be pre-engineered or conventional steel?
It depends on whether the extension repeats the existing building. Continuing the same frame spacing and roof shape can suit a pre-engineered frame. A different span or height, an overhead crane or heavy equipment usually suits conventional structural steel. Masas builds both, so it can say from the drawings which one the extension calls for.
Can the extension’s roof and cladding be included?
Yes. Roofing and cladding systems are named in Masas’s ISO-certified scope alongside structural steel and pre-engineered buildings, so the frame, the envelope and the junction with the existing roof can come under one subcontract. That leaves one party responsible for the line where new meets old, which is where leaks on an extension tend to start.
Does Masas have to take the whole extension package?
No. Masas prices work as a full package of design, fabrication and erection, or as any part of it: design only, supply only, or erection of steel that another company fabricated. On the battery factory extension for Barq Group, for example, Masas’s scope was engineering, fabrication and erection supervision.